Why historic churches are hard to heat

Thick solid walls, high roofs, single glazing and a building that sits empty most of the week. Heating an old church well is less about raw output and more about putting warmth where people sit, without harming the building.

Warm air rises straight into the roof space, so a system that simply heats the air can run for hours before the congregation feels it. Historic fabric and contents, including organs, timber screens, wall paintings and monuments, are sensitive to quick swings in temperature and humidity. Short, aggressive bursts of heat in a cold building are the pattern that does most damage.

So the right system depends on how your church is used: how many days a week, for how long, and how many people. That is the first thing we ask on a survey.

Options

Choosing a system for a historic building

There is no single right answer. These are the options we most often consider for listed and historic churches.

Upgrading the existing system

Often the least intrusive route. New condensing boilers can run on existing pipework and radiators. At Heacham Parish Church, two Keston 55kW boilers with long twin flues avoided cutting new flue routes through the building.

Pew and local heating

Heating close to where people sit, rather than the whole volume of the church. Well suited to buildings used once or twice a week, and quick to warm up.

Underfloor heating

Gentle, even and invisible. Best considered when the floor is being lifted anyway, and suited to churches used several times a week.

Overhead radiant heating

Warms people and surfaces rather than the air, so it works quickly in tall spaces. Where and how the panels are mounted needs care in a listed interior.

Heat pumps

A low carbon option that works best with longer, gentler heating and large emitters. See our guide to low carbon church heating.

Controls

Remote and smart time controls let you heat for services and events only, and hold a low background temperature to protect the building. Often the quickest win of all.

Permissions

What you need before work starts

Most church heating work needs some form of approval, and getting it lined up early is what keeps a project on programme.

We provide the survey, specification and technical information your application needs, and work alongside your architect or inspecting architect where you have one.

Bats. Many churches have roosting bats, which are legally protected. If works affect roof spaces or voids, a bat survey may be needed first.
Church of England

The faculty system

Works are approved through your diocese, advised by the Diocesan Advisory Committee (DAC). Repairs to an existing heating system, including new controls, generally need no permission (List A). Replacing a boiler where you switch to a non-fossil fuel, and electric pew heaters on pews made after 1850, need the archdeacon's written permission (List B). Replacing a gas or oil boiler like for like needs a faculty, and you will be asked how you have considered the Church's net zero guidance.

Other denominations

Ecclesiastical exemption

In England, Methodist, Roman Catholic, Baptist Union and United Reformed churches have their own internal approval systems in place of listed building consent. Other listed places of worship need listed building consent from the local council.

Everyone

Planning permission

External work such as a heat pump unit, a new flue or an oil tank may still need planning permission, particularly in a conservation area. Arrangements in Wales differ, so check with your denomination first.

FAQs

Questions churches ask us

Do we need a faculty to replace our church boiler?

In the Church of England, usually yes. Since July 2022, replacing a gas or oil boiler like for like needs a faculty. Replacing a boiler in the same place where it switches to, or already uses, a non-fossil fuel supply is treated more lightly, through List A or List B. Your DAC will confirm which route applies to your church.

Can underfloor heating go into a listed church?

Often, yes, and it is usually most practical when the floor is being lifted for other reasons. It needs permission, and the floor and anything beneath it have to be considered carefully. It also suits buildings used several times a week better than a church used for one service on a Sunday.

Will new heating harm our organ or fittings?

The biggest risk to organs, timber and decorated surfaces is large, rapid swings in temperature and humidity. Good controls, gentle warm-up times and avoiding blasting a cold building with heat all help. It is worth talking to your organ builder before the system is designed.

Can you work around services and events?

Yes. We plan installation around services, weddings, funerals and the busy weeks of Advent, Christmas and Easter, and agree the programme with you before work starts.

Do you work outside Staffordshire?

Yes. We are based in Stoke-on-Trent and work on churches across England and Wales, including recent projects in Norfolk and Cheshire.

← Back to church heating